Products » AC High Current

 

Primary Current Injection Test Set.

Primary Injection test sets are used to loading. Calibration and testing of CT's bimetals relays, Protection relays etc. Mostly Primary Injection Test set are designed as per customer's specification. The Primary Injections Test sets are of 15 minutes ON/30 Minutes OFF duty i.e. testing duty only. Loading transformers are design for continuous use for Temperature Rise for bus duct/Bus Bar etc.

Optional accessories requirement may include cable termination, timer, Temperature Indicator, multiple contactor, individual Phase control etc.

SPECIAL FEATURES

  • Compact in nature
  • It is available in portable trolley type/stationery type  model Amps.
  • Optional digital/analogue timer.
  • Main Transformer upto 25,000 Amps Naturally air cooled type.






Print this Page
 

Home | About us | What's New | Technical Support | Services | Employment | Contact  us

Copyright © Rectifiers & Electronics. All rights reserved.